G22006 |
SAS High-Performance Markdown Optimization 4.3_M2 |
Issue(s) Addressed: | Introduced: |
45556 | ALERT - Analytical hierarchy requires migration script |
G22001 |
45430 | ALERT - Dates available in the date picker for plan start and end dates are not aligned to fiscal week |
G22001 |
45262 | Approve-to-budget at product-location level does not honor uniform timing groups |
G22002 |
45417 | TKTException code = 2 (Floating point divide by zero) |
G22002 |
45546 | Spend values for low-owned products might be incorrect |
G22002 |
45619 | Load_STG2DM_Budget.sas fails because of incorrect sort order |
G22002 |
45659 | ALERT - ATTR_HIER_JOB runs for a long time |
G22002 |
45810 | Baseline offset correction factor not applied in optimization |
G22002 |
45840 | Percentage Off Discount might result in incorrect prices |
G22002 |
45343 | Not all plans have historical metrics |
G22002 |
45547 | ALERT - Weekly detail view might not show data |
G22002 |
45603 | ALERT - Error: job 'MDO_xxxxxx_mppca_out' encountered a fatal error |
G22002 |
45678 | Memory errors during optimization |
G22002 |
45811 | ERROR: TKTException code = 10 (Domain exception) |
G22002 |
45841 | ALERT - "Blocked markdown period rule violated." Plan Status Message |
G22002 |
45842 | Low Baseline Demand discount might be incorrect |
G22002 |
46283 | Reference inventory might be excluded from inventory pool when product geos have a maximum weekly base forecast less than 0.005 |
G22003 |
48924 | ALERT - Batch optimization fails with ERROR: TKTException code = 6 (Access violation) |
G22004 |
49319 | Java exception occurs when attempting to open Markdown Approvals view |
G22004 |
46349 | Plans with an end date in the past are not marked complete |
G22005 |
50216 | The Minimum Weeks Between Markdowns rule is violated when midweek markdowns are present |
G22006 |
|
D indicates that the Documentation has special pre-installation, post-installation or other unique instructions not commonly used for hot fix deployment. |